Safety technical measures for installation of coal mine drum screen

A. Preparations before construction: The materials and accessories required for construction are fully prepared (three types of I-beam, channel steel, steel plate, electric welding machine, wire, bar, chain, 2 pulleys, 4 inch steel pipe, 3 inch steel pipe, 2 sets of oxygen acetylene, sand, cement, red brick, air duct, wind raft 2, etc.). The lifting beam is made to ensure that the lifting trommel screen is firm and reliable. Before construction, the construction supervisor will lead all construction personnel to learn the measures. The construction personnel must arrive at the construction site 30 minutes in advance to familiarize themselves with the operation of the on-site equipment. The person in charge of the construction shall have a clear grasp of all the lines, equipment and materials on site. The person in charge of construction assigns the tasks of the construction personnel on site and makes the construction personnel clear their respective tasks.

the trommel screen machine


B. Precautions during construction: The construction person in charge reports the start and end of the construction of the dispatching room. During the construction, the construction personnel must concentrate on the work, strictly abide by the three non-injury principle and other various operating procedures, and operate according to the regulations. All construction personnel must wear necessary protective equipment such as helmets and gloves. First establish reliable personnel and equipment protection facilities on site to ensure the safety of personnel and equipment. Clean up the construction site and clean the ground to a hard ground (cement floor). Demolition of the original wall at the fastest speed, optional wind, forklift and so on. When removing the old drum screen and sand coal belt: cut off the power supply; cut off the ground; remove the motor, reducer and front and rear rollers; remove the belt and trommel screen; transport to a place where safety does not affect production. When lifting the drum screen: choose a firm lifting point and a fixed point. When lifting and transporting objects, always pay attention to check whether there is any abnormality in the surrounding environment, and it is forbidden to work in unsafe conditions. Participants should concentrate on avoiding standing in the unsafe places such as under heavy objects or in front of heavy objects, and can only stand on the side. During the operation, follow the unified command of the responsible person and cooperate with each other to cut, weld and assemble according to the size of the site (note the material saving).

When transferring objects at high places, it is strictly forbidden to throw them up and down. When moving long objects such as ladders and materials in the relocation area, they should be transported by two people. The on-site monitoring should be strengthened and a sufficient safety distance should be maintained with the live parts. When installing the trommel screen, repeat the inspection of the pulley (sensitive and reliable) and the lifting point (firm). Check the robustness of the lifting beam used and the plausibility of its position. Safety inspections should be carried out on the hoisting tackle used to ensure good performance, safety and reliability. Chains are used as slings, and chains and screws must be firmly connected. When installing, the screws should be even and diagonally aligned. Welding is strictly carried out according to the welding process. The wall should meet the requirements. For the joint surface of the equipment and the parts that are easily damaged, be careful not to damage it during disassembly and installation. After dismantling the welder and protective equipment, test run. During the trial operation, it must be jointly accepted by the construction person in charge, the technical person in charge, and the mine leader. After acceptance, it will be delivered to the user for use (with written report). When dismantling, relocation, and installation, pay attention to the protection of oxygen meters, acetylene tables and other facilities. It is necessary to carry out civilized construction, and it is strictly forbidden to dry and die hard.




C. Precautions after the completion of construction 1. The construction person in charge reports the construction end of the relevant mine leadership and dispatching room and resumes normal production. 2. Clean up the construction site and fill in the records. 3. The construction manager will finally check the site. Eliminate lost materials. 4. If there is any violation of the above provisions, the safety supervision department shall impose penalties according to the punishment regulations. For other unfinished matters, please refer to the relevant provisions of the "Safety Regulations for Coal Mines".

Comments

Popular posts from this blog

The significance of high pressure large ball press machine

information about ball press machine Ball press machine  is a key suppressing machine in the pellet technology complete equipment developed and designed on the principle of extrusion molding for powder material. Our company received the national patent of invention certificate of large ball press machine with patent No. ZL2007.1.0163951.4. Recently, the first GY2412 ball press machine has been successfully manufactured in our factory with diameter of press roll 2.4 meter and width 1.2 meter. The capacity of the machine can reach 50-100t/h according to different material. Our product is the largest  high-pressure ball press machine  of highest pressure and largest capacity featuring in advanced product design theory, rational structure, affordable forcing feeding, adjustable pressure, feeding intellectualization, ball production automation with inlaid rolling skin easy to exchange and maintain. The significance of ball press machine  I t helps realize the lar...

Several types of flocculation tanks

The concentrator is a continuous working concentration and clarification equipment. It is mainly used for dehydration of fine and tailings pulp in wet beneficiation operations. It is also widely used in the concentration of solid slurry in coal, steel, chemical, building materials, water sources and sewage treatment. And purification. The ordinary concentrator works reliably, has low operating costs, and can store and buffer the feedstock. However, it is based on the gravity sedimentation of the particles. The sedimentation velocity is proportional to the square of the particle diameter, which is used to treat the microparticles and has low efficiency. The high-efficiency concentrating machine mainly uses the reasonable use of flocculant and the cloth feeding method at the bottom to increase the sedimentation speed, which is one of the most important progress in the concentration technology. Different type of flocculation tanks Thickener tanks , Deep Cone Thickener, Sludge Thi...

Slove method of the clogging of trommel screen sieve

The drum screen is a simple screening device.  The trommel screen  is easy to close and collect dust, the maintenance is small, the maintenance is simple, and the service life is long. It is a device frequently used in refractory materials, coal, river sand classification, and sandstone classification. The advantage of the trommel screen is that the structure is not complicated so that the device can be quickly operated, and when the trommel has problems, people can easily solve it. But what should I do when the screen of the trommel screen is blocked? The following screen will introduce several ways to solve the phenomenon of blocking the net. The trommel screen sometimes adopts a mechanism added to the fixed frame, and then the mechanism rotates to drive the belt mounted on the belt to continuously smear the surface of the sieve hole, thereby sucking out the raw material particles blocked in the sieve hole. One of the disadvantages in practice is that it produces a lot ...