Build a sedimentation tank at the construction site, first discharge the sewage into the sedimentation tank, remove suspended matter and oil substances and neutralize them, and then discharge them into the river after testing to meet the discharge standards. During the drilling and pouring process, a screen is used to separate small gravel, sand and other solid particles in the mud, and the mud is discharged to the first sedimentation tank, the second sedimentation tank, and the third sedimentation tank for full sedimentation. During the construction process, the first sedimentation tank, the second sedimentation tank, and the third sedimentation tank are cleaned in time by an excavator, and the cleaned sediment is transported to the evaporation tank, and after natural dehydration and solidification, it is transported to the storage yard or the waste dump. For the abandoned mud water, flocculants are added to the mud water. Since mud water is a suspended liquid containing a certain am...